CSS Prepare

optional · CSS study notes

III.8 Policy Making and Implementation in Pakistan

🧠

Key points — 30-second recap

  • Who makes policy: Federal Cabinet and Parliament; provincial cabinets and assemblies (post-18th Amendment most social sectors are provincial); CCI, NEC and NFC for shared matters; ministries draft through summaries under the Rules of Business 1973.
  • Formal route: problem → ministry drafts → inter-ministerial consultation → summary to Cabinet → approval / bill to legislature → rules and SOPs → budget (PSDP / ADP) → field implementation → review.
  • Real influences: military establishment, IMF and donors, courts (suo motu), business and landed elites, media.
  • Implementation gap causes: weak capacity, politicisation, poor coordination, lack of funds, corruption, frequent policy reversals, weak M&E.
  • Hook: Good policies, poor delivery.

📜

Syllabus item III.8: "Policy making and implementation in Pakistan". Read the policy-cycle foundation and model comparisons in III.3, then use this page for Pakistan's institutions and implementation. Implementation theory is on III.4.

Policy-cycle foundation: definitions, all six stages, agenda levels and formulation are integrated into III.3 Policy Analysis. Apply that framework to the Pakistan institutions and processes below.

1. Institutional Framework for Policy Making

  • Federal level
    • Parliament — laws, budget approval, committees.
    • Prime Minister and Federal Cabinet — approve policies through summaries (Rules of Business 1973).
    • Ministries / Divisions — draft policies; consult other divisions (Finance, Law, Planning).
    • Planning Commission — development policy, PSDP, plans.
    • ECC (Economic Coordination Committee of the Cabinet) — economic decisions.
  • Shared / intergovernmental
    • CCI (Art. 153–154) — Federal Legislative List Part II matters.
    • NEC (Art. 156) — national development plans.
    • NFC (Art. 160) — resource distribution.
  • Provincial level
    • Provincial assemblies and cabinets; Planning and Development Boards / Departments; line departments.
    • After the 18th Amendment (2010), education, health, agriculture, social welfare and labour policy are mainly provincial.
  • Local level — elected local governments under Art. 140-A (powers vary by province).

2. The Policy-Making Process in Pakistan

  • 1. Problem identification and agenda setting
    • establish the issue's nature, history, affected groups, root causes and gaps in existing policy; use data and public consultation.
    • A manifesto, crisis, court decision, donor condition or media pressure may then bring it onto the government's agenda.
    • Political visibility alone does not establish policy need.
  • 2. Formulation — ministry prepares a draft; task forces and commissions; consultation with stakeholders (often limited).
  • 3. Inter-ministerial consultation — Finance, Law and Planning views attached to the summary.
  • 4. Adoption — Cabinet approval; bill passed by Parliament / Assembly; ordinance in urgent cases.
  • 5. Resource allocation — budget, PSDP / ADP, PC-I approval (DDWP → CDWP → ECNEC).
  • 6. Implementation — attached departments, provincial departments, district administration, autonomous bodies.
  • 7. Monitoring and evaluation — Planning Commission's Projects Wing (monitoring), provincial M&E directorates, Auditor-General, PAC.

3. Informal Actors and Influences

  • Military establishment — security, foreign and increasingly economic policy (e.g., SIFC, 2023).
  • IMF, World Bank, ADB — conditions on taxes, energy prices, subsidies (see III.7).
  • Judiciary — suo motu actions and PILs shaping policy (water, prices, local elections).
  • Business, landed and religious lobbies — tax exemptions, sugar and wheat policy, education curricula.
  • Media and civil society — agenda setting; pressure for reversal.
  • Bureaucracy — drafts, advises and implements; strong influence through files and data.
  • Policy actors versus resources
    • executive, legislature, judiciary, bureaucracies and regulators have distinct legal powers; business associations, NGOs, researchers, professional bodies, unions and citizens influence agendas through expertise, mobilisation, lobbying and consultation.
    • Financial, informational and organisational resources help explain whose proposals receive attention.
    • The influence of any actor varies with the policy issue and constitutional authority.

4. Features of Policy Making in Pakistan

  • Highly centralised and elite-driven.
  • Reactive and crisis-driven rather than planned.
  • Weak use of evidence and data.
  • Limited public consultation.
  • Frequent reversals with changes of government.
  • Donor-influenced economic policy.
  • Poor federal–provincial coordination after devolution.

5. Why Implementation Fails (2018 Q5)

  • Policy design faults
    • incorrect diagnosis, vague goals, unrealistic targets and no costing.
    • Treating a symptom as the cause can produce an efficiently delivered programme that still misses the problem; implementation reform alone cannot fix faulty design.
  • Political factors — lack of continuity; patronage; interference in postings.
  • Administrative capacity — weak skills, frequent transfers, poor coordination.
  • Financial factors — late or insufficient releases; plans larger than budgets.
  • Corruption and rent-seeking.
  • Resistance — from vested interests and from staff.
  • Evaluation and feedback gap — missing baselines, activity counts mistaken for outcomes, weak assessment of unintended effects, and findings that do not influence subsequent funding or redesign.
  • Low public participation and trust.
  • Theory link: Pressman and Wildavsky (1973) — the more clearances a policy needs, the lower the chance of success.

6. Examples (use with care)

  • Successes or partial successes
    • BISP (2008) — targeted cash transfers using NADRA data;
    • NADRA's identity system;
    • polio programme's structure through EOCs (with gaps);
    • Punjab land-record computerisation.
  • Persistent gaps
    • education (Article 25-A goals vs out-of-school children);
    • tax policy (narrow base, exemptions);
    • energy sector (circular debt);
    • local government (delayed elections).
  • Verify current figures before quoting.

7. Way Forward

  • Evidence-based policy units in ministries.
  • Regulatory impact assessment and public consultation before major policies.
  • Cross-party consensus on core long-term policies (charter of economy).
  • Link plans to the medium-term budget.
  • Stable tenure for implementers.
  • Strong independent M&E with published results.
  • Empowered local governments for last-mile delivery.
  • Digital tracking of delivery (dashboards, citizen feedback), combined with independent assessment of outcomes; expenditure and output counts alone do not prove success.

Connect each weakness to a remedy

GapDiagnostic questionPractical remedy
Identification / designWas the actual cause diagnosed, and were existing measures assessed?Baseline, problem tree, stakeholder consultation and tested theory of change
ImplementationWere funds, staff, authority and coordination available when needed?Costed action plan, named lead agency, realistic milestones and frontline feedback
EvaluationDid results improve, for whom, at what cost, and were findings used?Credible outcome/impact design, publication, management response and budget feedback

Illustrative application — girls' schooling: identify whether transport, household costs or teacher absence constrain attendance; choose instruments against those causes; fund and assign delivery; then assess attendance, learning, exclusion and cost per additional participant. Label this as an illustration, not an evaluated result from a named programme.

8. Critical Evaluation

  • Delivery weaknesses matter, but not every failed policy was well designed. Distinguish faulty diagnosis and instrument choice from implementation failures and external shocks.
  • Exam verdict: Better policy performance requires evidence-based diagnosis, legitimate and feasible choices, funded implementation, and evaluation that changes subsequent decisions.

9. 📌 Past Paper Questions — CSS 2015–2026

Subjective questions

MCQ practice

  • Development projects above the CDWP limit are approved by: (A) DDWP (B) ECNEC (C) NFC (D) None of these → ✅ B.
  • Federal policy summaries go to the Cabinet under the: (A) Rules of Business 1973 (B) Estacode (C) PPRA Rules (D) None of these → ✅ A.
  • "Implementation" (1973) highlighting multiple clearance points was written by: (A) Pressman and Wildavsky (B) Lipsky (C) Dye (D) None of these → ✅ A.

10. 🎯 CSS Exam Perspective

10.1 How often it comes

  • Two full questions (2018, 2025) — the Pakistan implementation gap is a favourite.

10.2 Likely 2027 angles

  • Policy-making process in Pakistan and its actors.
  • Role of the IMF / establishment in economic policy.
  • Why good policies fail — with examples.

10.3 Outline for a 20-mark question

  • Q: Critically analyse the policy-making and implementation process in Pakistan.
    • I. Introduction — good policies, poor delivery
    • II. Institutional framework — federal, intergovernmental, provincial, local
    • III. Process — seven steps
    • IV. Informal actors
    • V. Features / weaknesses of policy making
    • VI. Causes of implementation failure
    • VII. Examples
    • VIII. Way forward
    • IX. Conclusion

10.4 How to score

  • Draw the process chain with Pakistani bodies at each step.
  • Name Pressman and Wildavsky and Lipsky in the implementation part.
  • Give one success and one failure example.

10.5 Common mistakes

  • Only listing problems without explaining the process.
  • Ignoring the 18th Amendment's shift of policy to provinces.

10.6 Active recall

  • Seven steps of policy making in Pakistan.
  • Six causes of implementation failure.

🇵🇰 Pakistan examples — understand, apply and cite

How to use: choose the case that proves your point. “Exam sentence” is original model wording, not a quotation from an official. Facts are tied to the linked source and reporting period; practical applications are analytical explanations.

1. 2022 floods → assessment → recovery framework — policy-cycle application

  • Documented fact: The PDNA diagnosed recovery needs; the 4RF organised the subsequent recovery approach. Source.
  • Plain meaning / application: Map the case analytically: disaster reveals a problem → public attention → assessment and options → recovery framework → projects → evaluation. This is a teaching map, not a claim that policymaking followed a perfectly linear sequence.
  • Exam sentence: Pakistan's post-flood response illustrates how a crisis can move an issue onto the policy agenda and generate a programme of action.
  • Qualification: Keep plans, financing commitments, releases and completed works separate.

2. Punjab land records — a qualified implementation success

  • Documented fact: The 2017 World Bank account reports a shift from paper-based rural records to digital service delivery. Source.
  • Plain meaning / application: Use this alongside a difficult delivery case to avoid saying that every Pakistani policy fails.
  • Exam sentence: Punjab's land-record modernisation shows that administrative reform can improve service delivery when records and procedures are redesigned together.
  • Qualification: State the province and reporting period; avoid claims that all land problems were solved.

3. Polio — explain a delivery gap rather than merely blaming corruption

  • Documented fact: The June 2025 programme review identified access, missed children and hesitancy among key barriers. Source.
  • Plain meaning / application: Match remedies to causes: local engagement for distrust, safe access for hard-to-reach areas, and better tracking for missed children. These are analytical implications.
  • Exam sentence: Pakistan's polio programme illustrates that implementation gaps can arise from social and operational barriers as well as administrative weaknesses.
  • Qualification: Do not turn the example into an unsupported claim of programme-wide failure.

4. KP Revenue Mobilization and Resource Management, 2019 — provincial capacity

  • Documented fact: The June 2019 agreement supported KP's own-source revenue and public-resource management. Source.
  • Plain meaning / application: Provincial service responsibilities need fiscal and administrative capability. This is a useful provincial example alongside federal programmes.
  • Exam sentence: KP's revenue and resource-management programme illustrates the link between provincial revenue capacity and public-service delivery.
  • Qualification: The programme's stated purpose is not proof that fiscal targets were achieved.