Software Process Models (2017)
CSS CS Optional — Paper-I, Section-B, Topic V.
🔥 Frequency: appeared in 4 of last 7 papers (2021, 2023, 2024, 2025).
🔑 The Models
- Waterfall: sequential — requirements → design → code → test → deploy → maintain. Simple, but late changes are expensive.
- Incremental: usable slices delivered one after another → see own page.
- RAD: component-based, time-boxed → see own page.
- Prototyping:
- Throwaway — discard prototype, rebuild from scratch.
- Evolutionary — refine the prototype into final system → see Evolutionary Model page.
- Spiral (Boehm): iterative + risk-driven. Four quadrants per loop:
- Determine objectives/alternatives/constraints
- Evaluate alternatives, resolve risks
- Develop & verify next-level product
- Plan next iteration
- Best for: large, high-risk, poorly-understood projects.
- V-Model: Waterfall + paired verification stage per phase (requirements↔acceptance testing, design↔system testing).
📊 Quick Comparison
| Waterfall | Spiral | Agile | |
|---|---|---|---|
| Structure | Sequential | Risk-driven loops | Short sprints |
| Best for | Fixed requirements | Large/high-risk | Evolving requirements |
| Cost of late change | High | Managed via risk analysis | Low |
| Customer involvement | Front-loaded only | End of each loop | Continuous |
🔥 Past Papers
- 2021 Q7(b) — Spiral model in detail (7 marks).
- 2025 MCQ — "iterative cycles + continuous development" → Agile.
⚠️ MCQ Trap
- "Iterative + risk-driven" → Spiral
- "Iterative + customer-collaborative, short sprints" → Agile
📜 Past-Paper Questions & MCQs (CSS 2016–2026)
2017 · Paper-I · Q6(a) · 8 marks
Q. The design methodologies of programs include Big Bang, Code and Fix, Waterfall and the Spiral model. Consider a test (quiz) application and describe its development following each approach.
Ans.
- Big Bang: no formal planning or requirements. Developers start coding with vague ideas and hope the quiz app takes shape. It works only for tiny projects and has a high risk of failure.
- Code and Fix: write some code, test it, find defects, fix them, and repeat. The quiz app grows without design, so the code becomes messy and hard to maintain.
- Waterfall: collect all quiz requirements, design the database and screens, code, test, then deploy, in strict order. It is well documented but cannot handle changed requirements late in the process.
- Spiral: develop in iterations, each with four steps: set objectives, analyse and reduce risks, develop and test, and plan the next loop. The quiz app is built as a prototype, then a version with timers and scoring, then a full version, with risk checks each time.
- Summary: Spiral suits risky or changing projects, Waterfall suits stable requirements, and Big Bang and Code-and-Fix are only for tiny projects.
2021 · Paper-I · Q7(b) · 7 marks
Q. What is a software process model? Explain the spiral model in detail.
Ans.
- A software process model is an abstract description of the activities (requirements, design, coding, testing, maintenance) and their order for building software. Examples: waterfall, incremental, evolutionary, spiral, agile.
- Spiral model (Barry Boehm): a risk-driven model that combines iterative development with waterfall's control. The project moves around a spiral, and each loop has four quadrants:
- 1. Determine objectives: set goals, alternatives and constraints.
- 2. Identify and resolve risks: analyse risks and build prototypes to reduce them.
- 3. Develop and test: build and verify that loop's deliverable.
- 4. Plan the next iteration: review with the customer and plan the next loop.
- Radius of the spiral shows cost so far, and the angle shows progress.
- Pros: good risk management, suits large and changing projects, early customer feedback.
- Cons: costly, needs risk-analysis skill, and is complex to manage on small projects.